Interim Maintenance

Interim Maintenance

In late August 2012 urgent interim maintenance was undertaken on the Bell Tower. A cherry picker was hired from Forrester Access, and a detailed inspection was undertaken along with interim repairs/maintenance. These pictures were taken from the safety of the ground: in some blustery cross-winds near the parapet the platform moved around rather alarmingly!

Recent Posts