Badly cracked stone

A large section was badly cracked to the middle of the east elevation. A temporary holding repair was carried out in August 2012. Again the ornamentation below the dripstones was generally eroded. The small moulding to the bottom of the string course (i.e. immediately beneath the ornamentation) was badly decayed for the whole width of the south elevation and to a lesser extent to the east elevation.